Advanced Earned Value Management
- Three-Day Seminar
1.0 Overview of Earned Value
- What is Earned Value Management (EVM)?
- Brief History of EVM
- Rationale (Benefit?) for Using EVM
- When Do You Use EVM?
- Review of Basic EVM principles and formulas
2.0 Preparing To Use EVM
- What Must Be Put In Place to Use EVM?
Review of PMI Practice Standard for Earned Value Management
- Review of the ANSI Standard for Earned Value Management and the contractor’s Earned Value Management System Description
- Establishing the Performance Measurement Baseline (PMB)
How does a contractor build a PMB?
- Requirements Gathering and Documentation? (We do EVM on the requirements/definition stage; so much of this work is done after the IBR)
- Scope Definition and the WBS
- Scheduling Deliverables, Activities and Milestones
- Review of Proper Duration Estimating Processes
- Estimating the Budget
- Importance of a Time-Phased Budget
- Adjusting Estimates for Uncertainty and Risk
- Negotiating and Setting Baselines
- Scope Baseline
- Schedule Baseline
- Budget Baseline
- Quality Baseline
- Risk Baseline
- Conducting an Integrated Baseline Review
DOL responsibilities
Contractor responsibilities
- Exercise: Examine Documents Used In Developing An IBR
- Exercise: Conducting a Mock IBR Interview
3.0 The Mechanics of EVM
Discussion and Demonstration Of wInsight And Its Capabilities
- Working with Microsoft Project Files
- Working with Microsoft Excel Files
- This is done by the PMO due to security access control limitations in wInsight
- Working With wInsight and wInsight Administrator
- Overview Of EVM Reports And Analyses Generated By wInsight
4.0 In-Depth Analysis Of EVM Reports Generated By wInsight
- Classroom-wide Earned Value Example
- Discussion: Interpreting Earned Value Reports
- Exercise: Interpreting Earned Value Reports
- Necessity of Proper Tracking Methods to Ensure Reliable EV Measures
- Exercise: Decision-Making Using Earned Value Reports
- Discussion: Alternative Methods of Earned Value Predictions (PMI Standard)
5.0 Combining Earned Value With Other Tools And Reports
- Why “Earned Value Isn’t the Whole Story”
- What Earned Value Reports Don’t Tell You
- The Role of Earned Value With Regards To Project Risk Management
6.0 Integrating EVM Into The Organizational Structure And Culture
- Roles and Responsibilities for EVMS at DOL
- Who Needs What EVM Information and Why
- Adopting and Institutionalizing EVM
“Living EVM”
- Resources for EVM – NDIA Guidelines and Documents
|